Van Phong Warehouse Co Ltd (Van Phong Terminal) in Van Phong economic zone of central coastal Khanh Hoa province is one of companies attracting large investment of over 122 million USD.
The terminal is designed to be equipped with modern technologies with top priority given to safety methods in order to avoid environmental and fire problems during the project’s construction.
Read more
PTSC M&C
HAI SU TRANG & HAI SU DEN WHP
Thang Long Joint Operating Company (TLJOC) was established by Petroleum Contract to operate Block 15-2/01 offshore Vietnam in 2005. Block 15-2/01 geologically resides in the Cuu Long Basin, off the south-eastern Vietnamese coastline in an area of 2,832 km2 and has an average water depth of less than 50m. The fields are approximately 130km east - southeast from Vung Tau city.
Scope of Work: LV Distribution Panels, MCC drawout type ...
Read more
Bien Dong POC
BIEN DONG POC PROJECT
Bien Dong Petroleum Operating Company (“BDPOC”) signed a contract with CAC Joint Stock Comapny for the Supply of Spare Parts (“GOODS”) in support of BDPOC's operation in Blocks 05-2 and 05-3 offshore Vietnam, including Supply of Spare Parts for Displacement Flow Meter of Chemical Injection Skid – Group 1 and Supply of Spare Parts for Package Safety Transmiter.
Read more
PV ShipyardTam Dao 05 Jackup
Vietsovpetro signed a contract, valued at $200 million, with PetroVietnam Marine Shipyard (PV Shipyard) to build Tam Dao 05 Jackup, Construction of the JU2000E-design with classification by ABS, and the jackup is scheduled for delivery around mid-2016.Tam Dao 05 Jackup, Sub Type: Independent Leg Cantilever, Jackup Type: High-Specification, Max Water Depth 400ft, Max Drill Depth 30,000ft
Dimensions 231 x 250 x 31ft, Leg Length 547ft.
Read more
PTSC M&CSU TU VANG SOUTH-WEST WHP
New factory of Cambodia BeSu Tu Vang South West project (SVSW) located at Block 15-1 of Cuu Long Basin and is operated by the Cuu Long Joint Operating Company (CLJOC). PTSC M&C is the EPCI contractor. Block 15-1 is at the north end of the Cuu Long basin, about 180 km east-southeast of Ho Chi Minh City. Water depths in the block are 35-60 m. The design set the facility’s capacity at 100,000 bo/d, 160 MMscfd of lift and export gas, 225,000 b/d of injection water, and 130,000 b/d of produced water.
Read more
PTSC M&C
SU TU NAU WELLHEAD PLATFORM
Su Tu Nau located at and is operated by the Cuu Long Joint Operating Company (CLJOC). PTSC M&C is the EPCI contractor. Block 15-1 is at the north end of the Cuu Long basin, about 180 km east-southeast of Ho Chi Minh City. Water depths in the block are 35-60 m. The design set the facility’s capacity at 100,000 bo/d, 160 MMscfd of lift and export gas, 225,000 b/d of injection water, and 130,000 b/d of produced water.
Read more
VSP
SU TU VANG NORTH-EAST WHP
SVNE (5X) platform at Su Tu Vang oil-field at block 15-1 owned by Cuu Long Joint Operation Company and performed by Vietsovpetro as a general contractor. Block 15-1 is at the north end of the Cuu Long basin, about 180 km east-southeast of Ho Chi Minh City. Water depths in the block are 35-60 m. The design set the facility’s capacity at 100,000 bo/d, 160 MMscfd of lift and export gas, 225,000 b/d of injection water, and 130,000 b/d of produced water.
Read more
Phu Thai Caterpillar
SYNCHRONIZING PANEL FOR CUULONG JACKUP
Rig Name: Cuu Long Jackup - Rig Owner: VietsovPetro - Jack-up Type: Independent Leg Cantilever - Rig Design: Levingston Class 111-C Rated Water Depth: 300 ft - Drilling Depth: 20,000 ft.
Scope of Work: Engineering, procurement, assembly & FAT Generator Control & Synchronizing Panel at CAC workshop, supply installation instruction & commissioning services.
Read more
PTSC M&C
THANG LONG & DONG DO WHP
The two WHPs Thang Long-Dong Do jackets of Thang Long-Dong Do field development project, investor Lam Son Joint Operating Company (Lam Son JOC), are of Block 01/97 and 02/97 in the Cuu Long basin of the continental shelf of Vietnam. In particular, WHP-Thang Long with a jacket weighed 1,847 tons, two boat-landings with weight of 243 tons and 1,199 tons of piles. WHP-Dong Do has a weight of 1866 tons jacket, two 265 tons boat-landings and 1236 tons of piles.
Read more
PTSC M&C
Ghana OCTP Development Project
Ghana OCTP Offshore FPSO project is executed by PTSC M&C for ENI S.p.A as the Client, Yinson Production/Kanfa as the main Contractor. The project is implemented from March 2015 to May 2016.CAC has been awarded by PTSC M&C as the EPC contractor of Topside Package No. 2 – MM1 and MM2 of OCTP Offshore FPSO a Purchase Order for supply of the H2S Analyzers package and Ultrasonic Flowmeters package.
Read more