Ha Noi Highway, Linh Trung Ward, Thu Duc District, Ho Chi Minh City
- Project name: Coca-Cola HCM Site Master Plant,
- Project scale: 3.200m2 production & WH in Thu Duc District, HCMC, VN.
- Investor: Coca-Cola Beverages Vietnam Ltd.
- Main Contractor: CAC JSC.
- Project Period: 07/2013 - 08/2014.
- Project Description: Electrical and Installation.
- Scope of Work: Supply, Construction and Installation Services for
- Substation (22kV – 7MVA).
- Electrical distribution system (Tie-in Pole, Transformer, MV, LV SWG, Busway, ELV system (Lighting, FA, PA, CCTV, Earthling, Lightning).
- HVAC package (Water Chiller, VRV, Ventilation System, Cool storage, Cold Storage System).
- Automation & Control: Energy Management System (Power, Water, Gas, Steam Measurement Instrumentation), Control system for Raw Water Supply.