OCTP OFFSHORE FPSO – MM1 & MM2 MODULES
Ba Ria – Vung Tau Province, Vietnam
Ghana OCTP Offshore FPSO project is executed by PTSC Mechanical & Construction Limited Company (PTSC M&C) for ENI S.p.A as the Client, Yinson Production/Kanfa as the main Contractor. Offshore Cape Three Points Block (OCTP), located in the Tano Basin, around 60 km off the coast of Ghana.
The project is implemented from March 2015 to May 2016.
CAC Joint Stock Company has been awarded by PTSC M&C as the EPC contractor of Topside Package No. 2 – MM1 and MM2 of OCTP Offshore FPSO a Purchase Order for supply of the Ultrasonic Flowmeters package.
- Project Name: Ghana OCTP Development Project
- Package Name: Ultrasonic Flowmeters
- EPC: Yinson Production
- Client: PTSC M&C
- Location: Offshore Vung Tau, Vietnam
- Package Period: 4 months
- Project Description: CAC supply 3 Ultrasonic Flowmeters with accessories.
- Scope of Work: Document control, Scheduling, Procurement & Expediting, Instruction for installation & commissioning services.
- Package Name: H2S Analyzers
- EPC: Yinson Production
- Client: PTSC M&C
- Location: Offshore Vung Tau, Vietnam
- Package Period: 7 months
- Project Description: CAC supply 7 main H2S Analyzers on Rops 1-7.
- Scope of Work: Document control, Scheduling, Procurement & Expediting, Instruction for installation & commissioning services.