A new beverage facility in Phnom Penh marked its construction launch on 20 August 2015. Fuji CAC is the main contractor for an MEP package scheduled from July 2015 to February 2016.
The electrical scope included incoming connections, transformers, medium- and low-voltage switchgear, busway, lighting and extra-low-voltage systems. HVAC included chillers, VRV, ventilation and cold-storage systems.
Process piping covered steam, condensate, vaporized CO₂, compressed air, raw and treated water, chilled water and pipe supports. Fire-protection systems and power, building and life-safety management systems completed the recorded scope. Customer identity and inconsistent area figures in the legacy article have been omitted; the focus here is the engineering package.