Fuji CAC Joint Stock CompanyInnovating Energy Technology
Projects & Certifications

Project references.

Selected experience in Advanced manufacturing & Semiconductor, Food & Beverage, Chemical, Energy, Cement, and Other Industries.Our expertise in Automation & Control projects.

Specialist expertiseAutomation & ControlClick to explore our scope and project references

Fuji CAC provides comprehensive automation and control solutions, supported by engineering expertise in control system design, programming, system integration, testing, and commissioning.

Our engineers have experience working with control systems from multiple manufacturers, including Fuji Electric, Siemens, Rockwell Automation and Mitsubishi Electric, enabling us to integrate new solutions with existing plant systems and meet diverse application requirements.

Our engineers integrate programmable logic controllers (PLC), supervisory control and data acquisition (SCADA) and distributed control systems (DCS) to suit the application.

Facility monitoring and process control examples

Facility monitoring and control system configuration
Facility monitoring and control system configurationView full image ↗
Process-control HMI screen
Process-control HMI screenView full image ↗

Control engineering for new plants, production systems and existing-system upgrades, supported by workshop fabrication, simulation, FAT and site commissioning.

Scope of work

Control-philosophy review, hardware and software design, panel fabrication, programming, system integration, testing, commissioning, operator training and technical documentation.

Scope of supply

Plant & process control

PLC/SCADA, DCS, HMI and batch control; process instrumentation, weighing, MCC/drive integration and facility monitoring with BMS/FMCS.

Modernization & specialist systems

Legacy control migration, existing-system interfaces, boiler and filtration controls, crane drives and PLC/LCMS, conveyor control, MV-drive synchronization and DCS technical services.

Electrical and mechanical work, plant-equipment installation and utility connections can be coordinated with these control systems as part of Fuji CAC’s wider Engineering & Construction scope.

Energy consumption dashboard
Energy consumption dashboard
EMS · UMS

Energy & utility management

Energy Management Systems (EMS), including Power Management Systems (PMS), and Utility Management Systems (UMS) connect power and flow meters, PLCs and data-collection networks with monitoring software, trends and consumption reports. Scope can include EMS software, data acquisition, meters, cabling, fittings, integration and commissioning.

Select a screen to enlarge

Explore our references

Select a project to view its scope.

Process & production control14

Cement Handling AutomationCement silo, loading & packing control

SCADA/HMI monitoring and control for cement handling, covering silo feeding and discharge, bulk loading and packing lines. Operator screens display equipment status, operating modes, setpoints, permissive conditions and fault indications.

Water & Wastewater AutomationWastewater treatment & water reuse control

PLC and SCADA monitoring and control for wastewater treatment and water reuse, with redundant controllers and servers, remote I/O and industrial communication networks. Process coverage includes influent pumping and screening, pretreatment and equalization, membrane bioreactors (MBR), brackish-water reverse osmosis (BWRO), chemical dosing and operating-parameter settings.

DCS ProgrammingHydrogen plant DCS engineering

Control-philosophy analysis, logic and HMI design, safety DCS programming and factory testing for the hydrogen liquefaction plant.

Boiler Control UpgradeBoiler control-system replacement

New control-panel and HMI design and build, PLC programming, PID integration, testing and commissioning for boiler controls.

Engineering & project deliveryGreenfield feed mill

Electrical and automation design, supply and installation: MV connection, switchgear, transformers, main distribution, DCS/HMI, MCC and process power/control cabling; testing and commissioning.

Engineering & project deliveryFeed plant — MEP & automation

Electrical and automation design and installation, including MV connection, transformers, switchgear, distribution, DCS/HMI and MCC; lighting/ELV, HVAC, plumbing and firefighting systems, with testing and commissioning.

Electrical, Control & InstrumentationPolymer plant electrical & control systems

MCC installation, power and control cabling, explosion-protected junction boxes, I/O testing, process instrumentation and plant control-system engineering and commissioning.

Electrical, Control & InstrumentationCoatings production electrical & process control

Electrical and control installation, process instrumentation and plant control-system engineering, including MCCs, field connections, I/O testing and commissioning.

Engineering & project deliverySoya processing — electrical & automation

Complete electrical supply and installation: substation, dry transformers, MV/LV switchgear and busduct; building lighting, lightning protection, HVAC, telecommunications and fire alarm; oil-loading automation and automation engineering services.

DCS & Batch ControlLiquid-process batch automation

DCS and batch-control systems for a liquid-products plant, with cable and pneumatic piping installation. The reference records engineering, construction management, testing and start-up responsibilities.

Engineering & project deliveryLiquid-products plant — DCS & batch

DCS and batch automation, MCC, power/control cabling and weighing package for a liquid-products plant.

Engineering & project deliveryCement plant — integrated electrical systems

Design, supply and installation of complete electrical and automation systems: main substation, MV switchgear, transformers, motor starters, LV/MDB/MCC, DCS and instruments; telecommunications, CCTV, fire alarm and auxiliary systems.

Engineering & project deliveryCement plant — electrical & automation

Design, supply, installation and commissioning of electrical and automation systems, including MV motor starters, LV switchgear, MDB/MCC, DCS, instruments and auxiliaries.

Engineering & project deliveryWater plant — electrical & controls

Installation of electrical, cable and control systems for a water-supply plant.

Facility & power monitoring7

Instrumentation & DCS SupportThermal power instrumentation & DCS support

Flow-meter and equipment supply, document control, procurement coordination and technical support for installation, testing and commissioning within the DCS upgrade package.

BMS & system integrationRetail building management systems

Building-management system integration with PLCs, remote I/O, operator workstations, fibre/Ethernet networks and BACnet/Modbus interfaces. Project material also shows workshop preparation of control panels and the engineering team at site.

Mega Mall & Infrastructure →
Electrical & FMCSThin-film manufacturing — electrical & FMCS

Design, supply and installation of transformers, MV/LV switchgear and busway; FMCS instrumentation, valves, PLC/SCADA engineering and control panels; testing, commissioning, training and as-built documentation.

Electrical & FMCSThin-film manufacturing — facility controls

Design, supply, installation and programming of FMCS: instrumentation, valves, tubing and fittings, PLC/SCADA and new/modified control panels; testing, commissioning, training and as-built documentation.

DCS Repair & Technical SupportSteam-turbine DCS repair support

Control-system materials and spare parts, installation supervision, documentation and support for testing and commissioning of the steam-turbine DCS.

Engineering & project deliveryJackup generator synchronization

Engineering, procurement, assembly and FAT of generator control and synchronizing panels; installation instructions and commissioning services.

Engineering & project deliveryCoffee plant — utility automation

PLC/SCADA and MCC design and fabrication for air compressors, chilled/pre-treatment/cooling-tower and boiler systems; LV/control panels, process power/control cabling, UPS and hopper weighing, with I/O testing and commissioning.

Cranes, drives & system upgrades7

RTG ModernisationDrive & control upgrades for two RTG cranes

Drive-system upgrades, PLC/HMI engineering and CMS integration for RTG cranes 3 and 4 at a container terminal in the Philippines, including simulation, FAT, site testing, commissioning and training.

Explore Port Crane reference →
Crane Electrical & ControlsContainer-crane motors and controls

Integration of crane electrical systems, including Fuji Electric motors, drive and control panels, PLC/SCADA/LCMS programming, electrical commissioning and operator training for six rail-mounted quay cranes.

Explore six STS crane systems →
Drive Control IntegrationOverseas drive-control integration

Design and Build of control logic and HMI for medium-voltage inverter synchronization, including Fuji control components, workshop testing and commissioning at the end-user factory.

Control System ModernizationAluminium foil separator — control migration

Review of existing control philosophy and schematics; migration from Siemens S5 to Fuji Micrex SX SPH3000 for the midi separator, testing in Singapore and Japan, and commissioning in Malaysia.

Control Panels & SCADAMaterial-handling control expansion

Engineering for existing and new transportation lines, control-panel and SCADA supply, workshop testing and on-site commissioning.

Control System ModernizationCold filtration — control migration

Control-philosophy analysis and migration from Siemens S5 to Fuji Micrex SX SPH2000; new control panel and HMI, workshop testing and site commissioning.

Engineering & project deliveryGrinding terminal — control upgrade

Upgrade of the central control system for an operating grinding terminal, including automation engineering, software, control panels, testing and start-up.

Certifications & Safety Recognition

Qualifications & Certifications

Construction activity capacity, certified management systems and recognition of safe project delivery.

Certificate period: 19 Dec 2026 – 18 Dec 2029

Safety Recognition

Certificates of appreciation for contributions to project safety milestones.

Discuss a similar project.

Tell us your facility requirements and intended contract scope.

Contact Fuji CAC