Plant & production-line installation
Equipment layout coordination, installation planning and integration of production-line packages with the surrounding facility.
Plant equipment, production lines and machinery — connected to the facility.
Fuji CAC brings the plant and production-line installation experience of the former Fuji Electric E&C Vietnam business into its integrated engineering and construction offer. We coordinate equipment, structures, process pipework and utility interfaces through installation, testing and commissioning.
From individual machines to coordinated plant packages, the focus is a clear installation sequence and the connections needed for production.
Discuss your installation scope →
A coordinated installation package connects the machine, the process and the building services around it.
Equipment layout coordination, installation planning and integration of production-line packages with the surrounding facility.
Machinery, vessels, tanks, pumps and process equipment; positioning, assembly and coordination of equipment interfaces.
Steel structures, equipment supports, pipe racks, stairs and access platforms coordinated with the installation sequence.
Process and utility piping, valves, pumps, instrumentation and equipment hook-up; insulation and cladding.
Equipment power connections, control panels, field cabling and coordination with plant automation and monitoring systems.
Installation inspections, system checks, testing and commissioning coordination, documentation and handover.
Selected work from the former E&C business, now part of the Fuji CAC platform.
An integrated installation example covering outdoor and indoor equipment, steel structures, process pipework, insulation, and testing and commissioning.
Selected project experience
Figures represent the scope delivered on one selected project, including indoor and outdoor installation, testing and commissioning.


A supplied plant coordination model shows the relationship between process vessels, structures, pipe racks and the production building. It supports discussions about access, installation sequence and equipment connections.

Coordinating machinery, local control panels, overhead services and utility connections along an installed production line.
Equipment installation supported by coordinated pumps, process piping, valves and service connections.
Confirm equipment information, layout, access and interfaces with the customer and equipment suppliers.
Coordinate structures, delivery, lifting access and installation work fronts.
Position and assemble equipment; connect the defined piping, electrical and control interfaces.
Complete installation checks, testing, commissioning coordination and handover records.
Share your equipment list, layout, installation schedule and utility requirements with Fuji CAC.
Discuss your installation scope →